Looks like you are requesting to view the vertemax™
Slovakia site from the North American region.

Yes - Please Continue

OR

vertemax™ Canada vertemax™ Group

Case studies

Eurovea Tower, the first Slovak skyscraper – Edge Protection Case Study

The icons of Bratislava’s skyline will have a new companion. The first Slovak skyscraper Eurovea Tower will join them with a height of 168 meters. This project will bring high-quality housing for families and shops for locals providing many amenities. Eurovea Tower will offer 389 residences designed to highlight the city’s unique panoramic views. HAKI […]

Read more
Walkie Talkie; London’s fifth tallest building – Edge Protection Case Study

Walkie Talkie; London’s fifth tallest building. 20 Fenchurch Street, London is colloquially known as the Walkie Talkie, borne from its distinctive ‘handset’ appearance. The infamous, neo-futuristic design is instantly recognisable on the London skyline, towering above the heart of the Financial District. The vertemax Catchfan range was used to provide the best collective protection options for this […]

Read more
The Barwa Financial District in Doha, Qatar – Edge Protection Case Study

The Barwa Financial District in Doha, Qatar Designed and commissioned to serve the local and international Financial Sector. It plays home to 9 towers including a retail shopping centre, a 5-star hotel, financial institutions, residential accommodation and provides parking for up to 5,000 vehicles. Providing in excess of 30km of systemised Edge Protection to protect workers […]

Read more
CIBC Square development, downtown Toronto – Edge Protection Case Study

In the heart of downtown Toronto is the CIBC Square development. Towering over the Scotiabank Arena, home to the Toronto Maple Leafs and the NBA Champions, the Toronto Raptors. This twin skyscraper development promises to offer the latest in a new international standard of office building and will sit alongside the CN Tower to dominate […]

Read more
Safeguarding a part of British heritage – Battersea Power Station – Edge Protection Case Study

At the heart of one of London’s most ambitious new developments is the iconic Battersea Power Station. A Grade II listed building. Its restoration is key to safeguarding a part of British heritage. Overall, this £9bn project, set over 19 acres will transform this area of central London alongside the south bank of the Thames. Vertemax […]

Read more
vertemax® Selected to Safeguard Central Bank of Ireland – Edge Protection Case Study

vertemax™ Selected to Safeguard Central Bank of Ireland New Headquarters in Dublin Project   vertemax™ is delighted to have been chosen to provide essential workzone safety equipment to one of Europe’s most anticipated urban developments; Dublin’s Docklands. In particular, vertemax™ is playing a key part in securing the construction of the Central Bank of Ireland’s […]

Read more
Award winning Kidbrooke Village – Edge Protection Case Study

The Alupercha, the new lightweight fall arrest system from vertemax™ has achieved its first milestone, having just completed its first commercial workzone project after its recent market launch.   The first site to order and use the Alupercha fall arrest system was GCL at the Kidbrooke site in Greenwich – an award-winning regeneration project at […]

Read more
Harbour Central – London – Edge Protection Case Study

9 700 m2 of complete site safety vertemax™ supplied The Harbour Central project in East London with a complete site safety solution to secure a safe development of 901 luxury apartments. Measuring 9700 m2 and consisting of 4 towers totalling more than 130 floors and a further 3 low rise buildings, Galliard Homes Ltd ambitious Harbour Central Project demanded […]

Read more
Project Sapphire – Cambridge – Edge Protection Case Study

vertemax™ edge protection system was installed on the Project Sapphire site in Cambridge to help ensure that work was completed with zero incidents. Project  Sapphire, the  new £3m purpose-built extension to Granta Park in Cambridge, was completed with zero incidents thanks to the combined efforts of JB Developments & Construction, and construction safety specialist vertemax™. Granta […]

Read more
Walkie Talkie – 20 Fenchurch Street – Edge Protection Case Study

London’s fifth tallest building, 20 Fenchurch Street nicknamed the Walkie-Talkie, has complimented the new Post Modernist skyline of the capital. vertemax™ Catchfan was the chosen solution by contractor Archbell Greenwood who erected it around the building perimeter to provide an extremely safe containment solution. This ensured the personal safety of the sites workforce during construction and […]

Read more
Odeon Tower – Monaco – Edge Protection Case Study

The Odeon Tower is a skyscraper towering above the Principality of Monaco on the Mediterranean Cote d’Azur, offering some of the continents most sought after real estate. Designed by Italian architect Alexandre Giraldi and constructed by Vinci, France the building is home to 259 residences, 10 levels of parking, retail and business space including a […]

Read more
One Tower Bridge – London – Edge Protection Case Study

In the shadow of the world iconic Tower Bridge, is the prime residential site of Number One Tower Bridge, London. Commanding stunning views of the river Thames this development comprises almost 400 apartments spread across 9 blocks ranging from 5 to 20 storeys high. Contractor A J Morrisroe appointed by Berkeley Homes engaged the services of vertemax™ to […]

Read more
Allianz Riviera – Nice – Edge Protection Case Study

The Allianz Riviera, a purpose built multi-use stadium in Nice, France plays home to the city’s football team OGC Nice and is an impressive addition to France’s stadia. Soon to be showcased in UEFA’s Euro 2016 tournament, the stadium has a capacity of 35,000 and was constructed by VINCI. vertemax™ satisfied the requirement for edge […]

Read more
Barwa Financial District, Qatar – Edge Protection Case Study

The Barwa Financial District located in Doha’s West Bay Commercial District is a modern development consisting of 9 high rise office towers, a retail shopping centre and parking for 5,000 vehicles. Bouygues Construction was appointed the main contractor who awarded the contract to supply edge protection to vertemax™ who in turn provided in excess of […]

Read more