Harbour Central – London – Edge Protection Case Study

9 700 m2 of complete site safety

vertemax™ supplied The Harbour Central project in East London with a complete site safety solution to secure a safe development of 901 luxury apartments.

Measuring 9700 m2 and consisting of 4 towers totalling more than 130 floors and a further 3 low rise buildings, Galliard Homes Ltd ambitious Harbour Central Project demanded a complete site safety solution. Modebest Builders Ltd had no hesitation in selecting vertemax™ as their key partner to fulfil their needs.

– As Health & Safety is always the primary focus for us, we choose to work with reliable partners who can provide a comprehensive safety solution to help us deliver the project on time. We partner with vertemax™ for that reason, says Michael Brennan, Contracts Manager, Modebest Builders Ltd.

Safety planning from the beginning is vital on any project. It not only ensures all known risks are carefully considered and planned for but it also contributes to completing projects on time. For temporary access needs, vertemax™ Stairways were used to provide safe, quick and easy access to a range of excavation depths. During the formwork decking phase, Alsipercha provided uncompromising fall arrest safety whilst enhancing productivity through its large coverage area, allowing site operatives safe, unhindered movement across the deck.

On this project, the vertemax™ Catchfan was installed around the perimeter of the building together with a customised barrier system on each slab, which collectively provided excellent protection during construction. These products mitigated the risk of falling objects to provide excellent containment safety for operatives and members of the public throughout the project.

Large concrete pour solutions 
The Harbour Central Project has posed several challenges. The most complex aspect of this construction was a 2m deep second floor transfer slab in the Maine Tower comprising of 1350m3 concrete and 400 tonnes of steel, 90 tonnes of single, double and triple storey aluminium frame decking and 2.4m high shutter panels placed along the 130m perimeter. Two separate concrete pours were required to construct this slab. These pours were 1,350m3 and among the largest singular pours of C70/85 carried out in the UK.

Complete workzone safety
Reducing risks and minimising hazards are key priorities in any work place, it assists in keeping everyone safe. vertemax™ help their customers achieve this by supplying complete workzone safety solutions to support the safe delivery of projects on time and within budget.

– We pride ourselves in maintaining the highest level of customer service, says Jamie Russon, General Manager at vertemax™. Building partnerships with our customers by identifying and meeting their everyday needs, ensures our successes are as much theirs.

When finished, the Harbour Central project in London’s Docklands, located just minutes from the financial centre in Canary Wharf, will provide a vast range of luxury apartments along with penthouse apartments, a library, a concierge, a gym and spa, business suites and a cinema.

 

 

Contact Us

More like this

Case studies
Eurovea Tower, the first Slovak skyscraper – Edge Protection Case Study

The icons of Bratislava’s skyline will have a new companion. The first Slovak skyscraper Eurovea Tower will join them with a height of 168 meters. This project will bring high-quality housing for families and shops for locals providing many amenities. Eurovea Tower will offer 389 residences designed to highlight the city’s unique panoramic views. HAKI […]

Read more
Case studies
Walkie Talkie; London’s fifth tallest building – Edge Protection Case Study

Walkie Talkie; London’s fifth tallest building. 20 Fenchurch Street, London is colloquially known as the Walkie Talkie, borne from its distinctive ‘handset’ appearance. The infamous, neo-futuristic design is instantly recognisable on the London skyline, towering above the heart of the Financial District. The vertemax Catchfan range was used to provide the best collective protection options for this […]

Read more
Case studies
The Barwa Financial District in Doha, Qatar – Edge Protection Case Study

The Barwa Financial District in Doha, Qatar Designed and commissioned to serve the local and international Financial Sector. It plays home to 9 towers including a retail shopping centre, a 5-star hotel, financial institutions, residential accommodation and provides parking for up to 5,000 vehicles. Providing in excess of 30km of systemised Edge Protection to protect workers […]

Read more