Project Sapphire – Cambridge – Edge Protection Case Study

vertemax™ edge protection system was installed on the Project Sapphire site in Cambridge to help ensure that work was completed with zero incidents.
Project  Sapphire, the  new £3m purpose-built extension to Granta Park in Cambridge, was completed with zero incidents thanks to the combined efforts of JB Developments & Construction, and construction safety specialist vertemax™.
Granta Park, a 120-acre science, technology and biopharmaceutical business park, was first opened in 1997 and is home to many prestigious tenants such as Medimmune, Pfizer, PPD and TWI.
The project started in April 20
16 and ran for 16 weeks, with completion in July 2016. An impressive 1,200 tonnes of reinforced steel and 4,000 cu m of concrete were used to build three research and development laboratories. Reducing risk and minimising hazards was a major part of Project Sapphire.
JB
Developments & Construction, a specialist concrete basements and reinforced concrete frames contractor, was determined to provide a safer working environment for all its workers on the project.  

First-rate  safety
JB Development & Construction found that the lightweight, durable tammet systems barrier, accompanied by a selection of TC-Components, was the perfect solution for ensuring workers safety on site. Installed on multiple levels surrounding the project, the tammet systems barrier helps prevent any falling objects and debris from harming passers-by below.
JB Developments & Constructions project manager Jon Harwood says: “vertemax™ edge protection solutions ensured first-rate safety for all our site workers throughout Project Sapphire.

Fully compliant with EN 13374, class A, the tammet systems barrier provided a highly effective edge protection solution that was able to guarantee the safety of all Project Sapphire workers.  Following the successful completion of the project in July 2016, JB Developments & Construction was able to ensure zero incidents throughout the entirety of the project. vertemax™ was  proud to be part of such a prestigious project and to have helped provide an incident-free working environment.

 

 

Contact Us

More like this

Case studies
Eurovea Tower, the first Slovak skyscraper – Edge Protection Case Study

The icons of Bratislava’s skyline will have a new companion. The first Slovak skyscraper Eurovea Tower will join them with a height of 168 meters. This project will bring high-quality housing for families and shops for locals providing many amenities. Eurovea Tower will offer 389 residences designed to highlight the city’s unique panoramic views. HAKI […]

Read more
Case studies
Walkie Talkie; London’s fifth tallest building – Edge Protection Case Study

Walkie Talkie; London’s fifth tallest building. 20 Fenchurch Street, London is colloquially known as the Walkie Talkie, borne from its distinctive ‘handset’ appearance. The infamous, neo-futuristic design is instantly recognisable on the London skyline, towering above the heart of the Financial District. The vertemax Catchfan range was used to provide the best collective protection options for this […]

Read more
Case studies
The Barwa Financial District in Doha, Qatar – Edge Protection Case Study

The Barwa Financial District in Doha, Qatar Designed and commissioned to serve the local and international Financial Sector. It plays home to 9 towers including a retail shopping centre, a 5-star hotel, financial institutions, residential accommodation and provides parking for up to 5,000 vehicles. Providing in excess of 30km of systemised Edge Protection to protect workers […]

Read more